SB US81 over TURKEY CREEK

JCT US81/41 2.5N · County 059, Nebraska · Built 2001 · 2 Lanes · 6,540 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S081 03932L
Year Built
2001
Length
50.6 m (166 ft)
Max Span
19.2 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
6,540
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.