24TH RMP TO WB-I80 over 24TH ST

24TH ST INTRCHG · County 055, Nebraska · Built 1992 · 2 Lanes · 91,540 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S080 45335
Year Built
1992
Length
242.9 m (796.9 ft)
Max Span
23.2 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
91,540
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.