WB-I80 OFF RAMP over BIG PAPILLION CR/82AV&AM

I80 @ BIG PAPILLION CR · County 055, Nebraska · Built 1988 · 2 Lanes · 174,380 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S080 44846A
Year Built
1988
Length
104.9 m (344.2 ft)
Max Span
36 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
174,380
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.