I80 over ROAD 13

2W BUSHNELL INTERCHG · County 105, Nebraska · Built 1970 · 2 Lanes · 8,115 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
S080 00648R
Year Built
1970
Reconstructed
2020
Length
26.3 m (86.3 ft)
Max Span
11.7 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
8,115
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.