N79 over NORTH OAK CREEK

1S VALPARAISO · County 155, Nebraska · Built 2018 · 2 Lanes · 2,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
S079 01252
Year Built
2018
Length
42.7 m (140.1 ft)
Max Span
17.1 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.