US 75 over STREAM

US 75/BIA RD 52 WINNEBAGO · County 173, Nebraska · Built 2018 · 2 Lanes · 6,895 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
S075 16965
Year Built
2018
Length
6.2 m (20.3 ft)
Max Span
3 m
Lanes
2
Daily Traffic
6,895
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.