US75 over SILVER CREEK

3N TECHAMAH · County 021, Nebraska · Built 2021 · 2 Lanes · 1,465 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

41.821958, -96.231622

This bridge is in worse condition than 17.2% of bridges in County 021. The average bridge in Nebraska is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
S075 13601
Year Built
2021
Length
47.2 m (154.9 ft)
Max Span
19.8 m
Width
11.8 m (38.7 ft)
Lanes
2
Daily Traffic
1,465
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.