US75 over STUART CREEK

3.1N BLAIR · County 177, Nebraska · Built 2006 · 2 Lanes · 5,895 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S075 11925
Year Built
2006
Length
31.1 m (102 ft)
Max Span
30.5 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
5,895
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.