US75 over DEER CREEK

3S FORT CALHOUN · County 177, Nebraska · Built 1971 · 2 Lanes · 6,140 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
S075 10299
Year Built
1971
Length
6.7 m (22 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
6,140
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.