SB-US75 over I-480 RAMP 30TH ST EXIT

28TH & DODGE INTERCHANGE · County 055, Nebraska · Built 2009 · 4 Lanes · 72,270 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
8
Very Good

Bridge Details

Structure #
S075 09074
Year Built
2009
Reconstructed
2021
Length
94.5 m (310 ft)
Max Span
41.5 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
72,270
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.