SB-US75 over FAU 5020/CHANDLER RD

JCT US75/CHANDLER RD · County 153, Nebraska · Built 1988 · 2 Lanes · 58,870 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S075 08495L
Year Built
1988
Length
50.9 m (167 ft)
Max Span
28.3 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
58,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.