N69 over LINCOLN CREEK

3S GRESHAM · County 185, Nebraska · Built 1962 · 2 Lanes · 1,430 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
S069 06069
Year Built
1962
Reconstructed
2000
Length
49.4 m (162.1 ft)
Max Span
19.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
1,430
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.