N50 over LORES BRANCH

SCL DUBOIS · County 133, Nebraska · Built 2023 · 2 Lanes · 1,135 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S050 00179
Year Built
2023
Length
34.1 m (111.9 ft)
Max Span
33.5 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
1,135
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.