N47 over EMERGENCY SPILLWAY

5S GOTHENBURG · County 047, Nebraska · Built 1958 · 2 Lanes · 690 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S047 05757
Year Built
1958
Length
29.6 m (97.1 ft)
Max Span
11.9 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
690
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.