US34 over SULLIVAN DRAW

1W HAIGLER · County 057, Nebraska · Built 1960 · 2 Lanes · 1,570 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S034 00631
Year Built
1960
Length
33.5 m (109.9 ft)
Max Span
13.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,570
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.