US30/US275 over COUNTY HIGHWAY

JCT US30/US77 1E · County 053, Nebraska · Built 2006 · 2 Lanes · 10,370 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S030 42628L
Year Built
2006
Length
29.9 m (98.1 ft)
Max Span
29.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
10,370
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.