US30 over FREMONT CUTOFF DITCH

1.5N 8E NORTH BEND · County 053, Nebraska · Built 2023 · 2 Lanes · 7,494 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S030 41907R
Year Built
2023
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
7,494
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.