N22 over STREAM

14SW GENOA · County 125, Nebraska · Built 1957 · 2 Lanes · 1,175 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 7 Good

Location

41.387275, -97.968964

This bridge is in worse condition than 80.4% of bridges in County 125. The average bridge in Nebraska is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
S022 05903
Year Built
1957
Reconstructed
2014
Length
16.8 m (55.1 ft)
Max Span
6.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
1,175
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0