US20 over SOUTH CREEK

16NE LAUREL · County 051, Nebraska · Built 2022 · 2 Lanes · 2,295 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
S020 40702
Year Built
2022
Length
53 m (173.9 ft)
Max Span
20.7 m
Width
20.9 m (68.6 ft)
Lanes
2
Daily Traffic
2,295
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.