N15 over EAST BOW CREEK

12N LAUREL · County 027, Nebraska · Built 2001 · 2 Lanes · 665 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S015 19224
Year Built
2001
Length
43.6 m (143 ft)
Max Span
14.9 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
665
Material
Prestressed Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.