N14 over LOUP RIVER OVERFLOW

2S FULLERTON · County 125, Nebraska · Built 2003 · 2 Lanes · 1,940 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
S014 09725
Year Built
2003
Length
15.8 m (51.8 ft)
Max Span
15.2 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
1,940
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.