IRR/N12 over HOBOE CREEK

12W CROFTON · County 107, Nebraska · Built 1962 · 2 Lanes · 1,235 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S012 17716
Year Built
1962
Reconstructed
2013
Length
33.5 m (109.9 ft)
Max Span
13.4 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,235
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.