N8/N15 over UPRR

.1 SE FAIRBURY · County 095, Nebraska · Built 1999 · 2 Lanes · 1,860 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S008 05253
Year Built
1999
Length
75.6 m (248 ft)
Max Span
26.8 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
1,860
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.