US6 over PLATTE RIVER OVERFLOW

3NE ASHLAND · County 153, Nebraska · Built 1993 · 2 Lanes · 4,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
S006 34157
Year Built
1993
Length
73.8 m (242.1 ft)
Max Span
15.2 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
4,550
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.