US6 over CALLAHAN CREEK

3NE GREENWOOD · County 025, Nebraska · Built 1990 · 2 Lanes · 4,815 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S006 33485
Year Built
1990
Length
43.9 m (144 ft)
Max Span
18.3 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
4,815
Material
Prestressed Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.