559TH AVE/COL 7793 over STREAM

9W 1.6N OF WINSIDE · County 179, Nebraska · Built 2024 · 2 Lanes · 45 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
C009000325
Year Built
2024
Length
8.2 m (26.9 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
45
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.