485TH AVE over MIRA CREEK

.5N OF NORTH LOUP · County 175, Nebraska · Built 2020 · 2 Lanes · 105 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Condition Ratings

ComponentRatingDescription
Deck 9 Excellent
Superstructure 9 Excellent
Substructure 9 Excellent

Location

41.504228, -98.770333

This bridge is in worse condition than 33% of bridges in County 175. The average bridge in Nebraska is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
C008814710
Year Built
2020
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
105
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.