ROAD 25 over SAND CREEK

3S OF MORSE BLUFF · County 155, Nebraska · Built 1985 · 2 Lanes · 125 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
C007811555
Year Built
1985
Length
25.3 m (83 ft)
Max Span
9.4 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
125
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.