ROAD 26 over WAHOO CREEK N FK

.3S 4W OF MALMO · County 155, Nebraska · Built 2019 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
C007811330
Year Built
2019
Length
40.3 m (132.2 ft)
Max Span
15.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
150
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.