ROAD 2400 over BIG BLUE RIVER TRIB

1.2E 1.9S OF WILBER · County 151, Nebraska · Built 2022 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
C007614705
Year Built
2022
Length
7.7 m (25.3 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.