445TH AVE over COLUMBUS GENOA CANAL

1S 5W OF MONROE · County 141, Nebraska · Built 2021 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
C007111505
Year Built
2021
Length
54.9 m (180.1 ft)
Max Span
21.9 m
Width
6 m (19.7 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.