ROAD 4800 over STREAM

.3S 3.3E OAK · County 129, Nebraska · Built 2023 · 2 Lanes · 5 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
C006524707
Year Built
2023
Length
8.5 m (27.9 ft)
Max Span
2.2 m
Lanes
2
Daily Traffic
5
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.