COUNTY HIGHWAY over OX BOW CREEK
2.6N 2E NELSON · County 129, Nebraska · Built 1983 · 2 Lanes · 25 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
40.249211, -98.023558
This bridge is in worse condition than 47.8% of bridges in County 129. The average bridge in Nebraska is 0 years old; this one is 43 years old.
Nearby Bridges
ROAD 3800 over OX BOW CREEK
Built 1935
COUNTY HIGHWAY over STREAM
Built 2000
COUNTY HIGHWAY over OX BOW CREEK
Built 1987
ROAD 3700 over OX BOW CREEK
Built 1983
ROAD 3700 over OX BOW CREEK
Built 1935
ROAD 3700 over STREAM
Built 1987
RD 3900 over OXBOW CREEK TRIBUTARY
Built 2024
ROAD 4000 over ELK CREEK TRIB
Built 1988
N14 over OX BOW CREEK
Built 1937
FAS 2350 over ELK CREEK
Built 1971
Bridge Details
- Structure #
- C006501630
- Year Built
- 1983
- Length
- 16.2 m (53.1 ft)
- Max Span
- 15.8 m
- Width
- 8.2 m (26.9 ft)
- Lanes
- 2
- Daily Traffic
- 25
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.