PANAMA RD over OLIVE BRANCH (W 11)
JCT US77/N33 5.1W 4S · County 109, Nebraska · Built 2000 · 2 Lanes · 95 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
40.595722, -96.800633
This bridge is in worse condition than 70.6% of bridges in County 109. The average bridge in Nebraska is 0 years old; this one is 26 years old.
Nearby Bridges
PANAMA ROAD over OLIVE BRANCH TRIB(W 122)
Built 2019
SW 72ND ST over OLIVE BRANCH (V 90)
Built 1930
SW 42ND / FAS 3315 over OLIVE BRANCH (W 14)
Built 1963
SW 42ND /FAS 3315 over SALT CREEK (T 212)
Built 1939
SW 86TH ST over OLIVE BRANCH (V 62)
Built 1963
W PRINCETON ROAD over OLIVE BRANCH TRIB(W 164)
Built 2020
SW 29TH ST over SPRING BRANCH (W050)
Built 2023
W STAGECOACH RD over SPRING BRANCH (T 230)
Built 1981
W PANAMA RD over SPRING BRANCH (W 116)
Built 1939
SW 29TH ST over SALT CREEK (T 177)
Built 1935
Bridge Details
- Structure #
- C005506420
- Year Built
- 2000
- Length
- 43.6 m (143 ft)
- Max Span
- 17.1 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 95
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.