723 RD over LOST BRANCH TRIBUTARY

2S 2.3E OF CRAB ORCHARD · County 097, Nebraska · Built 2022 · 2 Lanes · 40 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
C004903224
Year Built
2022
Length
6.4 m (21 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
40
Material
Steel
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.