COLL 7526 over BLACKBIRD CREEK
11N ONEILL · County 089, Nebraska · Built 2016 · 2 Lanes · 65 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
42.624428, -98.639367
This bridge is in worse condition than 24% of bridges in County 089. The average bridge in Nebraska is 0 years old; this one is 10 years old.
Nearby Bridges
COUNTY HIGHWAY over BLACKBIRD CREEK
Built 1997
COUNTY HIGHWAY over BLACKBIRD CREEK
Built 1997
COUNTY HIGHWAY over STREAM
Built 1935
885 ROAD over BACKBIRD CREEK
Built 1989
COLL 7526 over HONEY CREEK
Built 2005
493RD AVE over BLACKBIRD CREEK
Built 1981
TOWNSHIP ROAD over BLACKBIRD CREEK
Built 1985
TOWNSHIP ROAD over BLACKBIRD CREEK
Built 1935
COLL 7511 over BLACKBIRD CREEK
Built 1989
884 ROAD over REDBIRD CREEK
Built 1987
Bridge Details
- Structure #
- C004543815
- Year Built
- 2016
- Length
- 24.4 m (80.1 ft)
- Max Span
- 9.8 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 65
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.