COLL 7507 over EAGLE CREEK
3.5E 14.5N OF EMMET · County 089, Nebraska · Built 1993 · 2 Lanes · 40 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.691097, -98.731194
This bridge is in worse condition than 27.3% of bridges in County 089. The average bridge in Nebraska is 0 years old; this one is 33 years old.
Nearby Bridges
FAS 2300 over EAGLE CREEK
Built 1983
COLL 7507 over EAGLE CREEK
Built 2018
COUNTY HIGHWAY over TURKEY CREEK
Built 1989
US281 over EAGLE CREEK
Built 1998
COLL 7507 over STREAM
Built 2001
COLL 7526 over HONEY CREEK
Built 2005
485TH AVE over EAGLE CREEK NORTH BRANCH
Built 1988
COUNTY HIGHWAY over STREAM
Built 1935
888TH RD over CAMP CREEK
Built 2018
885 ROAD over BACKBIRD CREEK
Built 1989
Bridge Details
- Structure #
- C004525335
- Year Built
- 1993
- Length
- 40.2 m (131.9 ft)
- Max Span
- 15.2 m
- Width
- 9.3 m (30.5 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.