CO RD 756/FAS 1600 over BUFFALO CREEK

JCT US30/L-24B 3.2N 3.5W · County 047, Nebraska · Built 1961 · 2 Lanes · 670 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
C002433810
Year Built
1961
Length
12.5 m (41 ft)
Max Span
11.3 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
670
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.