COUNTY HIGHWAY over NIOBRARA RIVER
8E 4.5S OF MERRIMAN · County 031, Nebraska · Built 1988 · 2 Lanes · 10 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
42.851561, -101.528533
This bridge is in worse condition than 45.6% of bridges in County 031. The average bridge in Nebraska is 0 years old; this one is 38 years old.
Bridge Details
- Structure #
- C001605505P
- Year Built
- 1988
- Length
- 70.4 m (231 ft)
- Max Span
- 17.7 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.