CONTINENTAL DR over SEP I 15

BUTTE-CONTINENTAL DR · County 093, Montana · Built 1963 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
U01807003+09761
Year Built
1963
Length
81 m (265.7 ft)
Max Span
23.8 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
5,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$576,000
Total Project Cost
$864,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.