S 565 over GREENFIELD SOUTH CANAL

7M N SIMMS · County 099, Montana · Built 1969 · 2 Lanes · 452 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S00565006+06501
Year Built
1969
Reconstructed
1997
Length
16.8 m (55.1 ft)
Max Span
5.3 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
452
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.