IRR over TONGUE RIVER
ASHLAND · County 087, Montana · Built 1970 · 2 Lanes · 877 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
45.597781, -106.27505
This bridge is in worse condition than 65.2% of bridges in County 087. The average bridge in Montana is 0 years old; this one is 56 years old.
Bridge Details
- Structure #
- S00447052+05081
- Year Built
- 1970
- Length
- 61.5 m (201.8 ft)
- Max Span
- 20.7 m
- Width
- 12.7 m (41.7 ft)
- Lanes
- 2
- Daily Traffic
- 877
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.