S 263 over INT FRENCHTOWN-I 90
FRENCHTOWN · County 063, Montana · Built 1971 · 2 Lanes · 100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 6 | Satisfactory |
Location
47.017258, -114.229353
This bridge is in worse condition than 32.5% of bridges in County 063. The average bridge in Montana is 0 years old; this one is 55 years old.
Nearby Bridges
E MULLAN RD over MILL CREEK
Built 2020
I 90 over SEP HOULE CREEK ROAD
Built 1971
I 90 over SEP HOULE CREEK ROAD
Built 1971
LOISELLE LN over FRENCHTOWN IRR CANAL 099
Built 1960
I 90 over SEP LOISELLE ROAD
Built 1971
I 90 over SEP LOISELLE ROAD
Built 1971
S 474 over RR
Built 1959
LACASSE LN over FRENCHTOWN IRR CANAL 094
Built 1960
HUSON RD over INT HUSON-I 90 012
Built 1971
KONA RANCH RD over CLARK FORK 011
Built 1987
Bridge Details
- Structure #
- S00263014+01031
- Year Built
- 1971
- Reconstructed
- 2011
- Length
- 69.2 m (227 ft)
- Max Span
- 23.8 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.