S 254 over REDWATER RIVER
11.1M NW RICHEY · County 021, Montana · Built 2014 · 2 Lanes · 66 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
47.715694, -105.251975
This bridge is in worse condition than 22% of bridges in County 021. The average bridge in Montana is 0 years old; this one is 12 years old.
Bridge Details
- Structure #
- S00254053+02001
- Year Built
- 2014
- Length
- 92.7 m (304.1 ft)
- Max Span
- 30.9 m
- Width
- 9.5 m (31.2 ft)
- Lanes
- 2
- Daily Traffic
- 66
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.