S 253 over YELLOWSTONE RIVER

1M NE TERRY · County 079, Montana · Built 1959 · 2 Lanes · 441 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S00253001+03031
Year Built
1959
Reconstructed
2012
Length
273.2 m (896.3 ft)
Max Span
64 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
441
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,713,000
Total Project Cost
$2,570,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.