S 81 over WARM SPRING CREEK
12M SW HILGER · County 027, Montana · Built 2008 · 2 Lanes · 377 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.232533, -109.558761
This bridge is in worse condition than 10.1% of bridges in County 027. The average bridge in Montana is 0 years old; this one is 18 years old.
Nearby Bridges
P-81 over WARM SPRING CREEK
Built 2020
S 81 over WARM SPRING CREEK
Built 1949
SANDROCK RD over WARM SPRINGS CREEK 077
Built 2010
S 81 over WARM SPRING CREEK
Built 1969
HANOVER RD over BIG SPRING CREEK
Built 1966
US 191 over WARM SPRINGS CREEK
Built 2011
P 81 over JUDITH RIVER
Built 2020
72 BENCH RD over WARM SPRINGS CREEK 078
Built 1980
SCOTT CROSSING over BIG SPRING CREEK 033
Built 2009
GRINDE RD over WARM SPRINGS CREEK 009
Built 1986
Bridge Details
- Structure #
- P00081033+06051
- Year Built
- 2008
- Length
- 48.1 m (157.8 ft)
- Max Span
- 38 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 377
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $204,000
- Total Project Cost
- $254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.