S 200 over DRAINAGE
10M SW RICHEY · County 021, Montana · Built 1959 · 2 Lanes · 307 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
47.561547, -105.249583
This bridge is in worse condition than 93.6% of bridges in County 021. The average bridge in Montana is 0 years old; this one is 67 years old.
Bridge Details
- Structure #
- P00051017+01831
- Year Built
- 1959
- Length
- 17.4 m (57.1 ft)
- Max Span
- 5.8 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 307
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $122,000
- Total Project Cost
- $134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.