US 191 FH 42 over SPANISH CREEK
7M S GALLATIN GATEWAY · County 031, Montana · Built 1931 · 2 Lanes · 8,952 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
45.474175, -111.269919
This bridge is in worse condition than 64.6% of bridges in County 031. The average bridge in Montana is 0 years old; this one is 95 years old.
Nearby Bridges
STORM CASTLE ROAD over GALLATIN RIVER
Built 1935
STORM CASTLE ROAD over SQ___ CREEK
Built 1954
US 191 FH 42 over GALLATIN RIVER
Built 1958
SPIRE ROCK CG LOOP over STORMCASTLE CREEK
Built 1957
SPIRE ROCK CG LOOP over STORMCASTLE CREEK
Built 1957
SPANISH CREEK ROAD over NORTH FORK SPANISH CREEK
Built 1967
US 191 FH 42 over GALLATIN RIVER
Built 1950
WILSON CREEK RD over IRRIGATION CANAL
Built 2019
RAT LAKE ROAD over STORMCASTLE CREEK
Built 1954
SPANISH CREEK ROAD over SOUTH FORK SPANISH CREEK
Built 1967
Bridge Details
- Structure #
- P00050068+02171
- Year Built
- 1931
- Reconstructed
- 1955
- Length
- 21.3 m (69.9 ft)
- Max Span
- 9.1 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 8,952
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $255,000
- Total Project Cost
- $383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.