IRR - S 13 over TULE CREEK

11M NE WOLF POINT · County 085, Montana · Built 1991 · 2 Lanes · 368 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

48.182872, -105.496114

This bridge is in worse condition than 36.8% of bridges in County 085. The average bridge in Montana is 0 years old; this one is 35 years old.

Nearby Bridges

Bridge Details

Structure #
P00032008+01001
Year Built
1991
Length
36.6 m (120.1 ft)
Max Span
10.1 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
368
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.