US 212 over POWDER RIVER
1M SE BROADUS · County 075, Montana · Built 1985 · 2 Lanes · 2,084 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
45.427294, -105.402925
This bridge is in worse condition than 39.1% of bridges in County 075. The average bridge in Montana is 0 years old; this one is 41 years old.
Bridge Details
- Structure #
- P00023080+05591
- Year Built
- 1985
- Length
- 190.5 m (625 ft)
- Max Span
- 52.5 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,084
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.